N&C Moderna were recently called upon to carry out the tiling within Arsenal’s state of the art, 143 acre training ground in Hertfordshire. The hydrotherapy pool was transformed with great workmanship to suit the grounds specific requirements.
Used by approximately 70 footballers, the facility harvests ten full-size pitches at the site, built to the exact specifications of the playing surface at Emirates Stadium. As well as the pitches, the facility boasts six changing rooms, a steam room, swimming pool with adjustable floor, gymnasium, treatment rooms, massage baths, and a restaurant.